Multi-agent coordination depends on what survives the handoff: the task’s limits, the evidence of completion and the meaning of a human answer. Leads, workers and reviewers can help, but each boundary gives the system another opportunity to lose one of those things. I’ve had a manager report finished before its work was ready, and answers change meaning on their way down the chain. Neither needed a difficult task to break coordination.

I wrote earlier about four orchestration patterns . That taxonomy helps choose how to divide work. Daily operation puts a different question in front of me: what can the caller safely conclude from a worker’s response? A plausible answer is cheap. Establishing that the requested work exists, respects its scope and passed its check takes more care.

For bounded work, I use a lead session that routes tasks to builder, search and research workers. Each worker gets a scoped brief, effect limits and an acceptance check. Workers don’t see the lead’s conversation, so a constraint left there is a constraint they don’t have. The brief has to carry everything needed to do the task, including what the worker may change or send.

This helps when work can be separated into artifacts the lead can inspect. It becomes less useful when writing the brief requires resolving nearly the whole task, or when the lead cannot check what comes back. Delegation still leaves the caller responsible for acceptance. In my setup, the lead verifies the artifact and reruns a relevant check itself before reporting done.

Long-lived domain managers solve a different problem. I use a coordinator above managers that each own one domain, with their own working context, status file and rules. That lets domain-specific work retain its context without putting every detail into the coordinator’s conversation. Questions for me come through the coordinator’s daily digest rather than arriving separately from every manager.

That extra layer also produced an early “done” report. A manager was waiting for its own workers and ended its turn with a still-waiting message. The finish notification fired, so the coordinator saw the manager as finished. The real result arrived later and notified nobody. The manager’s message described waiting, but the notification described completion. The coordinator received the wrong signal.

Completion therefore needs its own contract. For me, it means the artifact plus its check result, followed by the caller’s verification. A manager waiting on workers must not issue its final report until their results are in. Notifications should carry done, blocked or waiting, so an end-of-turn event cannot silently stand in for a work status.

Those states require different action. Waiting means a dependency is still running. Blocked means work cannot proceed without something changing. Done means the completion evidence is available to inspect. I’ve argued that blocked must be a valid result ; it also has to remain distinguishable as it travels through a hierarchy. Otherwise the coordinator either forgets unfinished work or makes the human investigate every apparent completion.

The other failure was answer relay drift. A worker used its own question tool to ask me, and the answers it recorded differed from what I’d actually told the coordinator. As answers moved down the chain, they lost which question and which person they belonged to. A downstream worker could receive something that looked like a settled human answer without enough context to know what it settled.

My rule is that workers don’t ask the human directly. Questions go up to the coordinator’s one channel. Answers go back down verbatim, together with the question they answer and who answered. A manager can add its interpretation separately, but the interpretation must not replace the answer. This is one place where a cleaner summary can make the record worse.

For a CTO, these failures consume the attention delegation was supposed to release. An early completion signal leaves work uncollected. An ambiguous answer creates another round of questions, or lets work continue on a decision the human never made. Adding managers only helps if the coordinator can trust their status and preserve the decisions passing through them.

Review needs a different kind of separation. Before a merge or a consequential decision, work authored by one vendor’s model goes to another vendor’s model. The reviewer gets the diff or decision, not the author’s reasoning. I want it to examine the work without first being persuaded by the explanation that produced it.

There is evidence for being cautious about model evaluation of model output. In their April 2024 paper, Panickssery, Bowman and Feng found that LLM evaluators scored their own outputs higher than others’ while human annotators rated them equal. Models could also recognize their own generations with non-trivial accuracy, and fine-tuning showed a linear correlation between self-recognition and self-preference. That doesn’t prove a different vendor makes a reviewer reliable. It does give me a reason not to treat another invocation of the authoring model as independent review.

I also use a council for uncertain decisions: several models give independent opinions on the same anonymised facts. They don’t see the lead’s recommendation. Showing it to them would make agreement harder to interpret, because I couldn’t separate their judgment of the facts from their response to the proposed answer. Blind judging gives me opinions formed before that influence.

A council or second opinion never replaces the cross-vendor review. The council helps examine a decision from different perspectives. The reviewer checks the actual work that is about to be accepted. Keeping those jobs separate matters when an appealing recommendation becomes a concrete change with consequences.

On Monday, take one delegated task and follow it across every handoff. Read the worker’s brief without the lead’s conversation. Check whether the completion notification points to an artifact and its check result. Trace one human answer back to its exact question and speaker, then inspect what the reviewer received. Fix a missing link before adding another worker.